Prior to breaking ground on any construction project, municipalities require that the proper zoning and licensing permits be obtained.
Related processes can sometimes take a number of months, and numerous meetings or negotiations can be required for them to move forward: from the application for a construction permit, complete rezoning of a parcel, current allowable use determined by each municipality, to the required allowable use for the project.
Project Managers and Senior Management at APM are experienced in obtaining proper zoning changes and licensing permits required for construction projects.
APM is capable of navigating and managing applications through the proper bureaucratic channels in order for our clients to successfully proceed with their construction projects.
For more information, please contact:
|
Ian Harper
Vice President
Engineering Services
iharper@apm.ca
ph: 902.569.4000 x107
fax: 902.569.1149 |
|
Adam Jay
Junior Engineer, E.I.T.
ajay@apm.ca
ph: 902.569.4000 x120
fax: 902.569.1149 |